Oil Field Services
With experienced staff and API standard drilling rigs and components, GYP is one of the most efficient and experienced drilling contractor in the region. As a member of IADC, the company carefully follows the regulations of health and safety of IADC and pays utmost attention to the environment. GYP is providing the following oil field services:
  • Drilling contracting (from 500 to 6,000 m)
  • Workover and well completion
  • Drilling and production engineering
  • Well design
  • Road and location construction
  • Drill pipe inspection
  • Crude oil transportation
GYP also offers 3rd party services:
  • Cementing
  • Drilling mud engineering
  • Mud logging
  • Open and cased hole drill stem testing
  • Coring (conventional)

 

Drilling and Workover Services

Recently, GYP has conducted the following drilling contracting services:

  • Established a Free Zone Branch in Egypt and drilled 3 wells for Burren Energy (UK) in 2006
  • Drilled one well for Edison SpA (Italy) in Egypt in 2006
  • Drilled one well for Zorlu PetroGas (Turkey) in Adana in late 2006 with National 1320 m.
  • Drilled one well for drilling 6000m well in Bulgaria for Direct Petroleum Bulgaria Ltd. in 2006. The well was the second deepest gas well in Bulgaria
  • Drilled on-shore well in Black Sea Region in 2007 for Lotus Petroleum Ltd. (Turkey)
  • Drilled 6 exploratory wells for Energy Operations Turkey (Terralliance, USA) in 2007
  • Completed drilling an exploration well and also completed a re-entry well in Morocco for Cabre Maroc Ltd.
  • Drilled well for Dana Petroleum in Morocco in 2009
  • Drilled on-shore well in Black Sea Region in 2008 for Zeta Petroleum Ltd. (Turkey)
  • Drilled on-shore well in Aegean Region in 2008 for Merty Energy(Turkey)
  • Drilled Caliktepe #1 well for Çalik Enerji in south-eastern part of Turkey (2010)
  • Drilled 1 well for Merty Enerji in Thrace Basin, Turkey (2010)
  • Signed contract with OMV (Austria) for drilling in Northern Iraq and spudded Bina-Bawi-3 well in Jan. 2011.
  • Drilled S.W.Kanun-1 well with F-200 rig for Melrose Resources (2011).
  • Drilled Caliktepe #2 well for Calik Enerji (2011)



2005 Well
ft.
Turkey Zeynel - 19 4.675
Boyabat - 2R 14.006
Karakilise - 2 8.285
Kelti - 1 7.071
  TOTAL 34.037
 
2006 Well
ft.
Egypt Washka - SW1 6.166
Waska - S1 9.470
UMM Habib 8.755
WWER - 1 7.500
Turkey
Zeynel - 20 4.466
Karakilise - 1R 10.430
Kekliktepe - 1 1.082
  TOTAL 47.869
     
2007 Well
ft.
Turkey Tekpinar - 1 6.240
Nemrut - 3 5.034
Zeynel - 3R 5.401
Bartin - 2 8.703
Toptepe - 1 7.945
Guney Kinik - 2 9.500
Ogunduk - 1 7.000
TOTAL 49.823
 
2008 Well
ft.
Bulgaria Devenci - 1 19.317
Turkey Arpatepe - 1 8.155
Hakan Yilmaz - 1 8.209
Copkoy - 1 4.750
Duzce - 1 3.937
Arpatepe - 2 8.218
Sarikiz - 1 6.045
Morocco Fes - 1 11.836
TOTAL 70.367
     
2009-2010 Well
ft.
Turkey Zeynel - 21 3.600
Nemrut-4 4.710
Hidirbeyli-3 3.800
Hidirbeyli-4 5.151
Hidirbeyli-5 6.400
Tuzla-11 2.850
Kurtkiraci - 1 1.842
Bagpinar-1 5.783
NE Ogunduk - 1 6.859
Arpatepe-3 8.160
Bulgurdag-11 5.002
Alkan-1 4.900
Morocco TAJ-1 11.739
Fes 1 re-entry 12.745
TOTAL 83.541
 
2010 Well
ft.
Turkey Bulgurdag - 12 4.635
Kutluk 7.732
Hidirbeyli-6 6.400
Hidirbeyli-7 7.075
Hidirbeyli-8 6.400
Germencik-1 6.400
Germencik-2 4.690
Copkoy-2 5.000
Damlica 5.625
Caliktepe 8.032
Hasancik-3 4.000
K.Hasancik-1 2.000
Bulgurdag-13 4.600
TOTAL 72.589
     
2011 Well
ft.
Turkey Bulgurdag-14 4.700
GM-3 7.872
AP-4 4.592
Sahabe-2 4.400
Altinakar-1 5.100
GM-4 8.216
AS-5 3.249
AP-5 4.592
GM-5 8.216
GM-6 8.216
AP-6 5.248
West Piyadeler 5.576
East Piyadeler 5.740
West Bayramyeri 5.576
Bostanci 1.640
S. W. Kanun-1 2.805
Kocahuyuk-1 8.000
Caliktepe-2 2.500
AS-12 3.800
Zeynel-22 5.000
AP-7 2.886
AP-8 4.854
AP-9 4.526
AP-10 1.635
AP-11 4.870
AP-12 4.592
AP-13 4.428
AS-11 4.319
AS-10 4.368
Iraq Bina Bawi 12.201
TOTAL 153.717
 
2012 Well
ft.
Turkey Arpatepe-5 ongoing
GM-10 ongoing
AP-14 ongoing
AS-12 3794

 

 

Cementing Services

GYP's twin HT 400 pumping unit combined with split 100 bbl/s batch tank virtually takes care of all pumping, cementing and acidizing jobs normally required. These two units are skid mounted and easily transported and can be placed at the drilling location from spud to completion, making it very convenient and economical for the operating company.

 

 

Mud Logging Unit

GYP's Tooke Engineer Mud Logging Unit is operated by experienced geologists 24 hours a day during drilling. This unit is equipped with a model 7000 gas chromatograph and detector with all the monitoring systems necessary for obtaining good quality mud logging information. This unit is skid mounted and easily transported to remote location.

 

 

Drill Stem Testing

GYP is thoroughly convinced that all drilling breaks and/or hydrocarbons should be tested so as to run conventional or straddle tests. The main component of the string is a 2 stage shut-in tool, hydraulic main valve, with Kuster AX1 recorders. This container is actually a test shop and can be placed on the location whereby tools can be serviced without transporting back to main camp. Testing charts are evaluated in our reservoir and well completion group.

 

 

Drill Pipe Inspection Unit

GYP is proud to have its own pipe inspection unit and makes this service available to 3rd parties. This unit is chasis mounted and easily driven to any desired rig or place. This is a portable drill pipe inspection unit with buggy heads 2 3/8", 2 7/8", 3 1/2", 4 1/2", 5" and 5 1/2". Full set of calibration and full set of O.D. Gauges, Nortex model 123 Ultrasonic Gauges, high/low air jacks, A.C. Coils (8" and 10"), air compressor, complete set of cables, has a utility bed that allows the operator to stand or sit inside the unit.

 
Home | About Us | Exploration | Production | Drilling Contracting | Services | Career | Contact | Türkçe
created by Mingus | supported by E-Kalite